Follow up to Diamond in a Day ways.
I'm thinking to do Diamond in a Day at Paris/Ballys.
And on 9/6JOB. But it looks like Paris has only 1$ or 2$
JOB which would be too slow. Ballys seems to have a 25$
JOB which would be fast. But probably would have painfull
swings (like BJ for that matter) -- anyone see any other
downside to using the 25$ JOB for DIAD?
http://members.cox.net/vpfree/Ball.htm

